WORK SCHEDULE AND TIMING

FIRST VISIT (Day 1)
Energy Saving Presentation (30 minutes)
Proposal Accepted by Client and signed
Energy Audit Before Data (7 days)

SECOND VISIT (Day 8)
Collect Energy Audit Before Data
Energy Saver Installation and testing for 1 day trial

THIRD VISIT (Day 10)
Collect Energy Audit After Data
Calculate Energy Saver Installed for 1 day trial
Make Energy Saver Proposal to Client